Log:
Assessments - 5, GPA: 3.8 ( )

Instruções de Operação Napoleon Fireplaces, Modelo SLBV-40NM

Fabricante : Napoleon Fireplaces
Arquivo Tamanho: 2.89 mb
Arquivo Nome :
Língua de Ensino: en
Ir para baixar



Facilidade de uso


• All appliances are factory-equipped with a flexible gas line connector and 1/2 inch shutoff valve (see Figure 17 on Page 15). • See Massachusetts Requirements on Page 4 for additional requirements for installations in the state of Massachusetts in the USA. • The gas supply line should NOT be connected to the appliance until Step 6 on Page 15). • A pipe joint compound rated for gas should be used on the threaded joints. Ensure that propane-resistant compounds are used in propane applications. Be very careful that the pipe compound does not get inside the pipe. • It is recommended to install a sediment trap in the supply line as close as possible to the appliance. Appliances using propane should have a sediment trap at the base of the tank. • Check with local building official for local code requirements (e.g., whether below- grade penetrations of the gas line are al lowed, etc.). IMPORTANT: If propane is used, be aware that if the tank size is too small (i.e., under 100 lbs if this is the only gas appliance in the dwelling; ref. NPFA 58), there may be pressure loss resulting in insufficient fuel delivery, which can result in sooting, severe delayed ignition, or other malfunctions. Any damage resulting from an improper installation, such as this, is not covered under the limited warranty. Step 3. Install Venting System and Exterior Termination These instructions should be used as a guideline and do not supercede local codes in any way. Installventingaccordingtolocalcodes,these instructions, the current National fuel Gas Code in the USA (ANSI-z223.1) or the current standards in Canada (CAN/CSA-B149.1). SLBV-35 and SLBV-40 series fireplaces must be vertically vented using listed type-B, double-walled vent pipe with the proper diameter (as listed below) and a listed vent termination. Required Pipe diameter SLBV-35 series: Requires 4 in. (102 mm) SLBV-40 series: Requires 5 in. (127 mm) NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. WARNING Sharp Edges. WatchYour Fingers! WARNING: EDGES OF SHEET METAL ARE SHARP! WEAR PROTECTIVE GLOVES AND USE EXTREME CARE WHEN HANDLING. Required tools: • Sheet Metal-resistant Gloves • Tin Snips 1. Using tin snips, cut the three connecting points securing the slug to the three tabs in the flue collar (as shown in Figure 10a), and remove the slug. Carefully dispose of slug in an appropriate container. Slug Figure 10a Cutting points 2. Connect the proper size Type B-vent system tothefireplacefluecollarbybendingupthe three tabs and securing with three sheet metalscrews(No.8orlarger)benduptabs. See Figure 10b. Then install the remainder of the Type B-vent to the outside. Figure 10b Type B-Vent SLBV-35 models: 4 in. (102 mm) SLBV-40 models: 5 in. (127 mm) SUPERIORSUPERIORB-VENT GAS FIREPLACES • MODELS SLBV-35, SLBV-40 • INSTALLATION INSTRUCTIONS 10 ft. Minimum Back View Of Appliance Vertical Installations Back View Of Appliance *12 ft. Min. **15 ft. Min. *with an offset up to 45 degrees** with an offset greater than 45deg...

Este manual também é adequado para os modelos :
Lareiras - SLBV-35NE (2.89 mb)
Lareiras - SLBV-35NE (2.89 mb)
Lareiras - SLBV-35NE (2.89 mb)
Lareiras - SLBV-35NE (2.89 mb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias