|
Facilidade de uso
Figure 6 - Minimum Mantel Clearances Header NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. pre-Installation Steps (Remove Glass Enclosure Panel) The appliance is shipped with all gas controls and components installed and pre-wired. Note: Remove the glass enclosure panel before installing the fireplace. To remove the glass enclosure panel: 1. Remove the shipping carton, and then remove the shipping pad, exposing the front glass panel. 2. Open the two latches securing the glass panel (under the firebox floor). 3. Remove the glass panel by tilting it outward at the bottom and lifting it up. 4. Set aside the glass enclosure panel in a safe location to protect it from inadvertent damage. TYPICAL INSTALLATION SEQUENCE The typical sequence of installation is outlined below, with page number references to the related detailed instructions. NOTE: Each installation is unique and may result in variations to these steps. Step 1. (Pages 8–10) Construct the appliance framing. Position the appliance within the framing and secure with nailing brackets. IMPORTANT! Bend up the appropriate top standoff spacers for the drywall/finish material thickness to be used (see Figure 7). Bend up the outer pair for 1/2" materials and the inner pair for 5/8" materials. Bend up the outer pair for 1/2" materials and the inner pair for 5/8" materials. Bend out the appropriate nailing flanges for the drywall/finish material to be used. Nailing flanges are provided for flush framing, 1/2 inch and 5/8 inch framing depths (see Figure 7). Step 2. (Page 11) Route the gas supply line to the appliance location. Step 3. (Page 11) Install the vent system and exterior termination. Step 4. (Page 12) Install field wiring. a. Millivolt Appliances: Install the operating control switch (not factory provided). b. Electronic Appliances: Field wire and install operating control switch. Step 5. (Page 14) [OPTIONAL]: Install outside supplemental combustion air kit. Step 6. (Page 15) Make connection to gas supply. Step 7. (Page 16) Verify appliance operation. Step 8. (Page 17) Install the logs, decorative volcanic stone, and glowing embers. Step 9. (Page 20) Install the glass enclosure panel. Step 10. (Page 20) Adjust burner air shutter to ensure proper flame appearance. Step 11. (Page 22) Perform spillage test. Step 12. (Page 23) Install hood. Step 13. (Page 23) Complete finished interior wall. Step 14. (Page 24) Attach "Safety-in- Operation" warnings. DETAILED INSTALLATION STEPS Step 1. Construct Appliance Framing Frame the appliance as illustrated in Figures 8-1 and 8-2. All framing details must allow for a minimum clearance to combustible framing members as shown in Table 6, Page 7. If the appliance is to be elevated above floor level, a solid continuous platform must be constructed below the appliance. Headers may be in direct contact with the appliance top standoff spacers when they are bent up vertically, maintaining the 3" clearance to the fireplace top, but must not be supported by them or ...
Este manual também é adequado para os modelos :Lareiras - SLBV-35NE (2.89 mb)
Lareiras - SLBV-35NE (2.89 mb)
Lareiras - SLBV-35NE (2.89 mb)
Lareiras - SLBV-35NE (2.89 mb)