Log:

Omega Engineering DPG1100ADBL

Downloads : 9 Arquivo Tamanho: 63 kb    Fabricante : Omega Engineering  
Categoria : equipamento de barco

Installation Precautions Tighten/remove with wrench on hex fitting only. Do not attempt to rotate gauge by turning housing. Use fittings appropriate for the pressure range of the gauge. Do not apply vacuum to gauges not designed for vacuum operation. NEVER insert objects into the gauge port or blow out with compressed air. Permanent damage not covered by warranty will result to the sensor. The DPG1100AD and DPG1100ADBL can be powered by any AC source of 8 to 24 VAC 50/60 Hz, or any DC source of

Omega Engineering DPG1100AD

Downloads : 9 Arquivo Tamanho: 63 kb    Fabricante : Omega Engineering  
Categoria : equipamento de barco

GAUGE reference units may be re-zeroed without affecting the span calibration. The gauge port must be open to the ambient with no pressure or vacuum applied. Adjust the Zero control until the gauge reads zero with the minus (–) sign occasionally flashing. Span calibration should only be attempted if the user has access to a pressure reference of known accuracy. The accuracy of the calibration equipment should be at least four times the gauge accuracy. Zero calibration must be done before span ca

Omega Engineering ULTRASONIC SENSOR LVU30

Downloads : 0 Arquivo Tamanho: 74 kb    Fabricante : Omega Engineering  
Categoria : Outras ferramentas

OMEGA’s WARRANTY adds an additional one (1) month grace period to the normal one (1) year product warranty to cover handling and shipping time. This ensures that OMEGA’s customers receive maximum coverage on each product. If the unit malfunctions, it must be returned to the factory for evaluation. OMEGA’s Customer Service Department will issue an Authorized Return (AR) number immediately upon phone or written request. Upon examination by OMEGA, if the unit is found to be defective, it will be re

Omega Engineering Wet/Wet Differential Sensor PX838

Downloads : 0 Arquivo Tamanho: 86 kb    Fabricante : Omega Engineering  
Categoria : Outras ferramentas

LIMITATION OF LIABILITY: The remedies of purchaser set forth herein are exclusive, and the total liability of OMEGA with respect to this order, whether based on contract, warranty, negligence, indemnification, strict liability or otherwise, shall not exceed the purchase price of the component upon which liability is based. In no event shall OMEGA be liable for consequential, incidental or special damages. CONDITIONS: Equipment sold by OMEGA is not intended to be used, nor shall it be used: (1) a

Omega Engineering SOLID STATE RELAYS SBG41705

Downloads : 6 Arquivo Tamanho: 104 kb    Fabricante : Omega Engineering  
Categoria : equipamento de bombagem

• Fusing of the solid-state relays to be in accordance with Fig. 1. Fuse F1 to be 6 amps slo-blo, 120 VAC for 120V line voltage; 250 VAC for 240 V application. **Note: All intrinsically safe wiring to intrinsically safe solid-state relays must be segregated from non-intrinsically safe wiring. Lockwasher* NutLockwasher* NutMountingScrew Plate Lockwasher* Terminal Lug Notes: 1. *(Lockwasher to be internal or external tooth type) 2. Grounding hardwre to be #8 or larger and S.S. Fig. 5. Mounting Pla

Omega Engineering SOLID STATE RELAYS SBG25872

Downloads : 4 Arquivo Tamanho: 104 kb    Fabricante : Omega Engineering  
Categoria : equipamento de bombagem

• The conductors of the intrinsically safe circuit should be sealed in a rigid metal conduit at the point where the wiring enters the hazardous area. The wiring and sensor switch should be such that conductive dusts in the hazardous area will not close the circuit. • Hazardous area field wiring will store energy due to distributed capacitance and inductance in proportion to its length. It is therefore recommended that the characteristics of the cable be known and judged against the length of run

Omega Engineering SOLID STATE RELAYS SBG25873

Downloads : 9 Arquivo Tamanho: 104 kb    Fabricante : Omega Engineering  
Categoria : equipamento de bombagem

Failure to observe this warning could result in serious injuries or damages. GROUP CAPACITANCE INDUCTANCE A & B 0.1 .F 3 mH C 0.2 .F 10mH D 0.3 .F 20mH Example: Typical values of capacitance for a twisted pair of copper wires is between 20 and 60 pF per foot. Using the maximum value of 60pF/ft, Groups A & B could have a run of 1500+ feet with safety. Inductance of a typical twisted pair is between 0.10 and 0.20 .H/ ft, thus making a cable run in this example essentially determined by the capacit

Omega Engineering SOLID STATE RELAYS SBG22445

Downloads : 11 Arquivo Tamanho: 104 kb    Fabricante : Omega Engineering  
Categoria : equipamento de bombagem

UNPACKING Remove the Packing List and verify that you have received all equipment. If you have any questions about the shipment, please call the OMEGA Customer Service Department at 1-800-622-2378 or (203) 359-1660. When you receive the shipment, inspect the container and equipment for any signs of damage. Note any evidence of rough handling in transit. Immediately report any damage to the shipping agent. NOTE The carrier will not honor any claims unless all shipping material is saved for their

Omega Engineering DVG64

Downloads : 4 Arquivo Tamanho: 131 kb    Fabricante : Omega Engineering  
Categoria : Sistemas de ventilação

1 micron resolution below 200 micron of vacuum Sensor Type Thermistor Connector Type Standard 1/4 inch male flare fitting Vacuum Range 0 - 12,000 Microns (0 - 1,600 Pascals) with vacuum increasing/decreasing indicator when above 12,000 Microns Scale Microns, PSI, InHg, milliBars, Pascals, Torr, milliTorr Operating Temp. Range 35°F to 125°F ( 2°C to 52°C) Overpressure 300 PSI max (20 Bar) Accuracy +/-10% (0 to 1000 microns) Power Source 9 Volt Alkaline battery (not included) Continuous Usage Over

Omega Engineering CN9400

Downloads : 0 Arquivo Tamanho: 171 kb    Fabricante : Omega Engineering  
Categoria : Estação Meteorológica

EN61010-1 / CSA 22.2 No 1010.1 - 92 To offer a minimum of Basic Insulation only. Suitable for installation within Catagory II and III and Pollution Degree 2. SEE ELECTRICAL INSTALLATION P29 & P30 It is the responsibility of the installation engineer to ensure this equipment is installed as specified in this manual and is in compliance with appropriate wiring regulations. CONFIGURATION All functions are front selectable, it is the responsibility of the installing engineer to ensure that the confi





categorias