![](/images/flag/s/en.gif)
Then route the cable under a pulley mounted on the plate welded on the rear Base Frame (1), attach Pulley Guard (28) and Metal Tab (27) at both side of the pulley, using one 3/8" X 2" Hex Bolt (117) and one 3/8" Nylon Nut (138). 4. Route the cable up and around pulley mounted in the second hole in the bottom of the Double Pulley Block (24), using one 3/8" X 1-3/4" Hex Bolt (118) and one 3/8" Nylon Nut (138). When cabling is complete, this pulley can be moved upward to take a slack or downward t